General Motors Egypt – Spray Booth Wastewater Treatment & Recycling System

Egypt
2023-09-05
250–280 m³/h
10 Months
Design, fabrication, installation & validation
General-Motors-Egypt

Overview

RAK Industrial Solutions successfully executed the rehabilitation, upgrading, and optimization of the Spray Booth Wastewater Treatment and Recycling System at General Motors Egypt. The project was designed to improve the treatment efficiency of wastewater generated from the paint shop while maximizing water recovery and reuse within the painting process.

The facility serves three major paint lines: Primer, Base Coat, and Clear Coat (Varnish), each operating through dedicated collection pits with handling capacities ranging from 250 to 280 m³/hour. The treatment and recycling system was comprehensively upgraded to enhance operational performance, reduce sludge accumulation, and improve overall system reliability.

The scope included the installation of specialized separation units for the removal of paint contaminants and suspended solids, replacement and upgrading of pumping systems, modernization of treatment equipment, and implementation of a high-efficiency Screw Press Dewatering System with a sludge handling capacity of 20 m³/hour.

In addition, screening systems were redesigned and upgraded to prevent solids accumulation within the collection pits, significantly reducing maintenance requirements and improving long-term operational efficiency. The recycled water stream, with a capacity reaching 280 m³/hour, is reused within the paint shop process, supporting water conservation and sustainable manufacturing practices.

The project was executed in accordance with General Motors’ stringent standards for Safety, Quality, Environmental Compliance, and Operational Excellence, reflecting RAK’s capability to deliver reliable industrial solutions for one of the world’s leading automotive manufacturers.

General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt
General-Motors-Egypt

Project Information

Location

Egypt

Project Date

2023-09-05

Capacity

250–280 m³/h

Execution Period

10 Months

Scope

Design, fabrication, installation & validation

Key Features

  • Spray Booth Wastewater Treatment & Recycling System

  • Primer, Base Coat & Clear Coat Paint Lines

  • Collection Pits Capacity: 250–280 m³/hour

  • Water Recycling Capacity: Up to 280 m³/hour

  • Sludge Dewatering Capacity: 20 m³/hour

  • Screw Press Dewatering System

  • Contaminant Separation Units

  • Upgraded Pumping Systems

  • Enhanced Screening Technology

  • Reduced Sludge Accumulation

  • Improved System Reliability

  • Compliance with GM Safety & Environmental Standards

  • Sustainable Water Reuse Solution