Projects

Nissan Egypt – Industrial Wastewater Treatment Plant

Egypt
25 m³/h
6 Months
Nissan-Egypt

Overview

A state-of-the-art 25 m³/h Industrial Wastewater Treatment Plant developed for Nissan Egypt, featuring an innovative chemical treatment approach through optimized blending of high-load and low-load wastewater streams. The facility incorporates DAF technology, sludge dewatering via Screw Press, advanced filtration, and chlorination systems, producing treated water suitable for irrigation while ensuring full environmental compliance and sustainable operation.

Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt
Nissan-Egypt

Project Information

Location

Egypt

Capacity

25 m³/h

Execution Period

6 Months

Project Details

* Design, supply, installation, testing, and commissioning of an Industrial Wastewater Treatment Plant (WWTP) with a treatment capacity of 25 m³/hour.

* The plant utilizes an advanced chemical treatment process based on a unique and optimized blending of high-load and low-load wastewater streams to maximize treatment efficiency.

* Equipped with a Dissolved Air Flotation (DAF) system for effective removal of oils, grease, and suspended solids.

* Includes a Screw Press unit for sludge dewatering, reducing sludge volume and disposal costs.

* Features a multi-stage Filtration System to enhance the quality of the treated water.

* Integrated Chlorination System for final disinfection and water quality assurance.

* Produces treated water suitable for landscape irrigation and agricultural applications.

* Designed and implemented in accordance with the highest environmental and operational standards, ensuring reliable and sustainable performance.

* The project was officially inaugurated in the presence of Kamel El-Wazir and Yasmine Fouad.

Technical Overview

The plant is designed for a treatment capacity of 25 m³/hour — equivalent to approximately 600 m³/day — treating two main wastewater streams:

1. High-load wastewater from metal surface treatment tanks used in body preparation and pre-painting processes.

2. Low-load wastewater from washing and production line operations.

The treatment system combines physical and chemical treatment processes to achieve maximum efficiency in removing oils, suspended solids, heavy metals, and organic loads, while fully complying with Egyptian environmental discharge and reuse standards.

⸻

Treatment Process Description

1. Pumping and Control System

• Equipped with Lowara high-efficiency feed pumps.

• pH meters, flowmeters, and pressure sensors ensure precise control and monitoring across all process stages.

• Electrical panels supplied by Siemens, offering reliable automation and protection.

2. Dissolved Air Flotation (DAF) System

• The heart of the treatment process — a Stainless Steel 304 DAF Unit, designed and manufactured for maximum resistance to corrosion and chemical stress.

• Equipped with a high-efficiency Ultra Fine Bubble Generator and automatic self-cleaning system.

• The unit combines both flotation and sedimentation zones, achieving exceptional removal rates of oils, solids, and metal contaminants.

3. Advanced Filtration System

• Multi-Media Filters for fine particle removal.

• Activated Carbon Filters arranged in Duty/Standby configuration to eliminate color, odor, and organic residues.

4. Sludge Dewatering Unit

• Sludge is collected in a Sludge Holding Tank and treated using a Screw Press Dewatering Unit developed by RACK for Environmental Solutions.

• The unit delivers high dewatering efficiency, producing dry sludge that is easy to handle and environmentally safe.

Sustainability and Reuse

A key feature of this project is its contribution to water reuse and sustainability.

The treated water is reused for landscape irrigation within the factory premises in coordination with the 6th of October City Authority.

This makes the plant a real-world example of Zero Liquid Discharge (ZLD) implementation in an industrial environment.

Intelligent Control and Automation

• The entire plant operates under a fully integrated SCADA system, allowing real-time monitoring and remote operation.

• An automatic alarm system ensures immediate alerts in case of operational deviations.

• All systems are designed for low energy consumption and minimal noise, supporting a sustainable and safe working environment.

Achievements and Impact

Thanks to RACK’s precise design and advanced implementation, the Nissan plant has achieved outstanding treatment results, with effluent quality fully compliant with Egyptian environmental standards.

The treated water is successfully reused for irrigation of green areas within the facility, significantly reducing fresh water consumption.

During the inauguration, Nissan Motors Egypt executives and government officials praised the project as a benchmark for sustainable industrial infrastructure, emphasizing its contribution to Egypt’s vision for green manufacturing.

Summary

The Nissan Motors Egypt Wastewater Treatment Plant is more than an industrial utility — it is a technological milestone that demonstrates RACK for Environmental Solutions’ capability to deliver compact, high-performance, and sustainable treatment systems, even under the most space-limited and technically demanding industrial conditions.