RAK supplies lamella settlers and tube settlers for sedimentation and clarification in water and wastewater treatment. Inclined plates and tubes multiply the effective settling area, so suspended solids settle faster in a smaller footprint.

Overview
Sedimentation separates settleable solids from water before filtration, reuse or discharge. Inclined plates and tubes increase the projected settling area inside a small tank. The result is clearer water in less space than a conventional clarifier.
A compact steel or FRP unit with inclined plates. Water flows between the plates, solids slide down into the sludge hopper and clarified water leaves from the top.
Capacity: 5–150 m³/h.
Models: LS-005 to LS-150.
Materials: stainless steel, mild steel or FRP.
Sludge scraper power: 0.25–0.5 kW.
Inlet nozzle: DN80–350.
Tube settler modules installed inside new or existing tanks to raise their capacity without building new basins.
Material: talc-reinforced polypropylene (PPTV), potable-grade PP.
Settling area gain: up to 15× per m² of tank area.
Operating temperature: 70°C continuous, 80°C maximum.
Adjustable inclination, tube length and module size.
Multiple shapes and cut-outs to fit the tank.
Drinking water treatment plants.
Municipal and industrial wastewater treatment plants.
Clarification after coagulation and flocculation.
Upgrading existing settling tanks.
Small footprint compared with conventional clarifiers.
Higher capacity from existing tanks with tube settlers.
Stable clarified-water quality before filtration or reuse.
Low power demand.
RAK sizes each unit or module set from the flow rate and water characteristics, then manufactures, supplies and installs it according to project requirements.
Inclined Settling Surfaces
Uses inclined surfaces to support the settling of suspended particles during water treatment.
Compact Settling Design
Provides an organized settling arrangement within the available treatment tank space.
Multiple Settler Configurations
Available in Lamella Settler and Tube Settler configurations to suit different treatment arrangements.
Suitable for Water Treatment
Designed for use in sedimentation and clarification stages of water and wastewater treatment.
Suspended Solids Separation
Used when suspended particles need to settle and separate from the water.
Water Clarification
Installed as part of treatment processes to support the clarification of water before further treatment.
Some of Our Projects

Design, manufacturing, and installation of a fully integrated fruit by-product handling system for Döhler Egypt. The project was developed to efficiently collect, convey, store, and manage the by-products generated from juice and concentrate production processes. The system consists of a series of heavy-duty screw conveyors with diameters ranging from 250 mm to 500 mm, engineered to handle up to 60–70 tons per hour while ensuring reliable and continuous operation. The conveyed material is transferred to specially designed stainless-steel storage silos, providing excellent resistance to corrosion and wear under demanding industrial conditions. The stored product can then be either loaded into transportation vehicles for external utilization or disposal, or redirected to internal production lines, including the cloudy juice processing line. A key challenge of the project was the engineering and manufacturing of the screw conveyors, which required precise calculations for pitch, rotational speed, product characteristics, throughput capacity, and dynamic balancing to ensure maximum efficiency and operational reliability. The entire system was designed, engineered, and manufactured in-house by RAK, demonstrating the company’s capabilities in custom industrial equipment and material handling solutions.
See More
RAK Industrial Solutions successfully completed the rehabilitation and modernization of the wastewater treatment plant for Shams Concentrates, located in El Tal El Kebir. The facility serves one of the region’s major citrus processing and concentrates production plants, supporting the company’s commitment to sustainable water management and environmental stewardship. The upgraded treatment plant was designed with a total treatment capacity of 40 m³/hour and incorporates a complete treatment process including Coarse Screening, Fine Screening, Equalization, Coagulation, Flocculation, DAF Technology, Multimedia Filtration, and Activated Carbon Filtration. The project involved a complete rehabilitation of the existing facility, replacing and upgrading key treatment components to transform the plant into a fully automated and highly efficient treatment system. The treated water quality achieves Grade A irrigation standards, allowing the recovered water to be reused within the company’s agricultural operations and citrus farms. By integrating advanced treatment technologies and automation systems, the project significantly improved treatment efficiency, reduced water consumption, and supported the company’s sustainability objectives through water recycling and reuse.
See More
RAK Industrial Solutions successfully executed the rehabilitation, upgrading, and optimization of the Spray Booth Wastewater Treatment and Recycling System at General Motors Egypt. The project was designed to improve the treatment efficiency of wastewater generated from the paint shop while maximizing water recovery and reuse within the painting process. The facility serves three major paint lines: Primer, Base Coat, and Clear Coat (Varnish), each operating through dedicated collection pits with handling capacities ranging from 250 to 280 m³/hour. The treatment and recycling system was comprehensively upgraded to enhance operational performance, reduce sludge accumulation, and improve overall system reliability. The scope included the installation of specialized separation units for the removal of paint contaminants and suspended solids, replacement and upgrading of pumping systems, modernization of treatment equipment, and implementation of a high-efficiency Screw Press Dewatering System with a sludge handling capacity of 20 m³/hour. In addition, screening systems were redesigned and upgraded to prevent solids accumulation within the collection pits, significantly reducing maintenance requirements and improving long-term operational efficiency. The recycled water stream, with a capacity reaching 280 m³/hour, is reused within the paint shop process, supporting water conservation and sustainable manufacturing practices. The project was executed in accordance with General Motors’ stringent standards for Safety, Quality, Environmental Compliance, and Operational Excellence, reflecting RAK’s capability to deliver reliable industrial solutions for one of the world’s leading automotive manufacturers.
See More
RAK Industrial Solutions designed, manufactured, installed, and commissioned a complete citrus by-product handling and storage system for Lina Foods, a member of El Banna Group, located in Sadat City. The project was developed to efficiently collect, transport, and store citrus processing by-products generated during juice and concentrate production operations. The system includes heavy-duty screw conveyors for citrus pulp and extracted oil transfer, suspended conveying lines, and automated material distribution systems that ensure continuous and reliable operation throughout the facility. The project also incorporates two storage silos with a capacity of 90 tons each, providing efficient bulk material storage and handling capabilities. To maximize operational efficiency and process control, all equipment and conveying systems were integrated into a centralized PLC and SCADA platform, enabling real-time monitoring, automation, and operational management from a central control room. The entire engineering, manufacturing, installation, and automation scope was executed by RAK, demonstrating its expertise in industrial material handling systems, bulk storage solutions, and process automation for the food and beverage industry.
See MoreContact our engineering team and receive a free technical site assessment.